Piping works – New Projects in Refinery Units

Project Description :

With permanent presence in Greek Refinery Facilities, SANIKO METAL Ltd is awarded significant piping Projects of revamping or replacing existing Equipment and Circuits. Working in operating units, Projects are delivered on time, taking into account the strict HSE and Safety standards demanded by our Clients.

Additional Info

  • Budget: 4.051.912,83 €
  • Client : HEL.PE. S.A. / Motor Oil Hellas
  • Location : HEL.PE. Elefsis Refinery / MOH Korinth Refinery
  • Duration : 2020 – In progress
Project DescriptionClient / LocationBudget
PIER 2 repair works and replacement of ULSD pipelines UG pipewayHEL.PE. S.A. / Elefsis Refinery878.802,17 €
Mechanical works & erection of New Fuel Oil pipeline 20″HEL.PE. S.A. / Elefsis Refinery1.071.831,66 €
Replacement of 20″ & 30″ pipelineHEL.PE. S.A. / Elefsis Refinery284.000,00 €
REFU-9073 – Erection of piperack Tunnel Area U-1100
REFU-9205 – Upgrade of Firefighting system North Tank farm
Pr. 20188811 – Erection of Steam rings at R-8501/2/3/4
REFU-7961 – Piping/Supports Erection inside Tank Dyke
REFU-8745 – Installation of P-1207A/B, E-1216 and piping
Motor Oil Hellas / Korinth Refinery447.729,00 €
REFU-9504 Installation of new pipelines I/C, erection of new pipe rack and revamping of existing structures, GT-7 UnitMotor Oil Hellas / Korinth Refinery660.000,00 €
ΕΡΓΟ-9014 Modification of F-1501 to Forced Draft – Mechanical works Α’ phase
ΕΡΓΟ-6420Α Pig station piping erection
GT-6 Tie-ins completion
REOF-9845 Installation of steam traps and erection of new manhole at T-760
Motor Oil Hellas / Korinth Refinery204.550,00 €
REOF-09312 Hydrogen Terminal Interconnection Motor Oil Hellas / Korinth Refinery300.000,00 €
REFU-8746 Installation of new propylene lines at PIER AMotor Oil Hellas / Korinth Refinery205.000,00 €