Our advantage in comparison with the competition is the immediate availability of : numerous modern welding machines, inductive Annealing and Annealing with electrical resistance machines, portable lathes covering diameters range from 25mm to 700mm, all specialized for the execution of all kinds of piping erection work of high, medium and low pressure.

saniko_metal_eksoplismos

MECHANIC EQUIPMENT

#DESCRIPTIONQUANTITYCONSTRUCTION TIME
1INDUCTION ANNEALING MACHINES 2 2002
2ANNEALING MACHINES WITH ELECTRICAL RESISTANCE 1 2002
3PORTABLE LATHE > Φ100 2 2000
4PORTABLE LATHE < Φ100 7 2006
5STABLE CUTTING – BEVELING OF TUBES MACHINE  1 2010
6PORTABLE CUTTING – BEVELING OF TUBES MACHINE (DIAMETER > 4 inches) 6 2009
7PORTABLE CUTTING – BEVELING OF TUBES MACHINE (DIAMETER < 4 inches) 6 2009
8PORTABLE THREAD CUTTING OF PIPES MACHINE UP TO 4’’ 1 2004
9PORTABLE THREAD CUTTING OF PIPES MACHINE UP TO 3’’ 2 2004-2009
10PORTABLE MAGNETIC DRILLING MACHINES 2 2004
11AERΙAL WORK PLATFORMS 2 2009
12PLASMA CUTTING MACHINES 5 2009
13DIESEL GENERATOR WELDING MACHINE – MOZA 1 2009
14DIESEL ELECTRIC GENERATOR 4 2009
15WELDING MACHINES 380V 30 2000-2011
16WELDING MACHINES 220V 10 2011
17AIR winch 5 ton. 2 2004
18ELECTRIC winch 1 ton.,2 ton., 5 ton. 8 2002-2006
19DOWELS INSTALLATIONMACHINE 1 2000
20COMPLETE CUTTING GROUP OF Oxygen – acetylene 10 2008-2011
21AIR COMPRESSORS 4 2004-2009
22TOOLBOX (COMPLETE WITH TOOLS) 40 2006-2011
23ANGLE GRINDERS (Φ125mm , Φ230mm ) 50 2008-2011
24BUS MERCEDES 13 SEATS 1 2001
25BUS IVECO 21 SEATS 1 2002
26FORKLIFTS 3 tons, 4 tons 2 2001
27CRANE ON TRUCKLIFTING CAPACITY 34 TNM1 2002
28 PICK UPVAN NISSAN 1 2004
29 PICK UP TRUCK 6 SEATS 2 2000
30 VAN 2 2007
31 OFFICE CONTAINERS 6 2009-2011
32 TOOL CONTAINERS 12 2009-2011
33 HYDRAULIC LIFTING CYLINDERS 20 2006-2008
34 CABLE PULLER HOIST 1.5 tons152006-2008
35CABLE PULLER HOIST 3 tons152006-2008
36RATCHET LEVER HOISTS 0.75 tons402006-2011
37RATCHET LEVER HOISTS 1,6 tons 50 2006-2011
38RATCHET LEVER HOISTS 3 tons30 2006-2011
39HAND CHAIN HOISTS 1.5 tons502006-2008
40HAND CHAIN HOISTS 3 tons 30 2006-2011
41HAND CHAIN HOISTS 5 tons 6 2006-2011
42TROLLEYS 2 ton 6 2011
43LIFTING CABLES 2 ton – 20 ton 30 ΣΕΤ 2000-2011
44 SCAFFOLD TUBES 8.000 Μ. 2006-2009
45 SCAFFOLDING WOODEN PLANKS 1000 2006-2009
46SCAFFOLD FRAMES 200 2006-2009