ergasies_ipsilis_piesis_ais_11

High Pressure Works at Steam Electrical Power Stations (P.P.C.)

Project Description :

High Pressure parts restoration and repair works in Units and Boilers of S.E.S. , replacement, construction and erection of Overheat Coils and Steam lines, various contingent and scheduled High Pressure works in S.E.S. Units

Additional Info

  • Budget: 3.390.263,05 €
  • Contract: –
  • Owner: P.P.C. S.A.
  • Area: S.E.S. KARDIAS / S.E.S CHANION / S.E.S. PTOLEMAIDA / S.E.S. AG. DIMITRIOU / S.E.S. MEGALOPOLIS / S.E.S. RHODES / S.E.S. ALIVERI
  • Perc.of Participation: 100%
  • Start Date: 2009
  • End Date: IN PROGRESS

Image Gallery

Scroll to Top