Project Description :
Construction of two-pipe District Heating main and secondary network ( istallation, erection, welding, ND testing, insulation, hydraulic testing, installation of leakage detection system ( Σ.Α.Δ.), circuit tension) during the expansion of the current District Heating Network in Amynteon area, Florina ( Amynteon – Levea – Filotas )
Additional Info
- Budget: 500.000 €
- Contract: Pr. Con. Ν. ΣΥ00455.13/2029.ΔΕΤΕΠΑ
- Owner: EKME S.A.
- Area: AMYNTAIO, LEVAIA, FILOTAS – FLORINA
- Perc.of Participation: –
- Start Date: 2013
- End Date: 2015