tilethermansi_amintaiou_1

Expansion of District Heating Network in Amyntaio, Levaia, Filotas – Florina

Project Description :

Construction of two-pipe District Heating main and secondary network ( istallation, erection, welding, ND testing, insulation, hydraulic testing, installation of leakage detection system ( Σ.Α.Δ.), circuit tension) during the expansion of the current District Heating Network in Amynteon area, Florina ( Amynteon – Levea – Filotas )

Additional Info

  • Budget: 500.000 €
  • Contract: Pr. Con. Ν. ΣΥ00455.13/2029.ΔΕΤΕΠΑ
  • Owner: EKME S.A.
  • Area: AMYNTAIO, LEVAIA, FILOTAS – FLORINA
  • Perc.of Participation: –
  • Start Date: 2013
  • End Date: 2015

Image Gallery

Scroll to Top